-
GuillermoExcellent! Fast delivery! I like to work with you again!
-
Perus ColetteIt is my pleasure to do the business with LiFong,they always do the best for us.
-
Robin SeifertI like the products and service provided by LiFong. They really take our interest into consideration.
Custom Extruded Aluminum Cold Forging Heat Sink for LED Anodized Cold Forging Metal Big Heat Sink
Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xMaterial | Aluminum | Surface Treatment | Anodized/Electroplate/Polish |
---|---|---|---|
Brand | LF | Size | 110mm Length |
Quality | 100% Checking | Usage | Aviation, Car, Motor, Bicycle And So On |
Tolerance | +/-0.01mm | Delivery Time | 7 Days For Samples, 25 Days For Bulk Production |
Performance | Heat Dissipation | Processing | Aluminum Extruded |
High Light | Aluminum Cold Forging Heat Sink,Cold Forging Heat Sink for LED |
The Cold Forging Aluminum Heat Sinks is used to the Fan, LED Light and Windows' Heat Sinks. Our MOQ is 1pc. The Sample also available. CNC Machining parts and Die Casting parts are still our main products. We will quote for you soon. Welcome to contact us!
Name | Custom Extruded Aluminum Cold Forging Heat Sink for LED Anodized Cold Forging Metal Big Heat Sink |
Brand | LF |
Material | Aluminum |
Surface treatment | Polish, Anodized, Electroplate |
Color | None |
Net Weight | 170 grams |
Packing | As your requested |
Delivery time | 7 days for samples, 25 days for Bulk production |
Shipping | By air or By sea |
Trade Terms | FOB |
Processing Technic:
1.Die Casting--Prototype/T1--Dimension Check-- Sample Approval-- SOP |
2.Die casting-- Deburring-- Machining--Dilling Holes/ Threading-- Quality Check (dimension and surface) -- Anodizing--QC (Surface Vision Checking)-- Packing |
Payment:
TT, Paypal,L/C, Western Union payment
Packaging & Delivery
Packing:
1. 1 pc part will be packed in the carton.
2. As for the customer's request.
Lead Time:
1-100pcs: 7 working days
100-1000pcs: 14-20 working days
>1000pcs: Will be negotiated
Advantages:
Professional Research and Design Team, Processes All Necessary equipment: Extrusion Machine: 7 Sets;
1. Strict Quality Control in Each Process and Finish Product Quality Control
2. Short Delivery Lead Time: 15-30 Days
3. Optional For OEM or ODM
4. Comprehensive After-Sale Service, Quick Responses For Daily Communication
Factory Environment: