• 300W - 500W Stamping Processing Copper Pipe Heat Sink For LED Stage Light
  • 300W - 500W Stamping Processing Copper Pipe Heat Sink For LED Stage Light

    300W - 500W Stamping Processing Copper Pipe Heat Sink For LED Stage Light

    Product Details:

    Place of Origin: China
    Brand Name: LF
    Certification: CE, GS, ROHS
    Model Number: LF-HS300-500CD

    Payment & Shipping Terms:

    Minimum Order Quantity: 100
    Price: US$12.8-30/pcs
    Packaging Details: carton packing.
    Payment Terms: L/C, Western Union, MoneyGram, D/A, D/P, T/T
    Supply Ability: 10000+pcs+month
    Get Best Price Contact Now

    Detail Information

    Material: Copper Pipe And Aluminum Color: Anti - Anodized
    Application: For Computer, Led Fixture, Other Device Dimension: 150*190 Mm
    Weight: 500 G Copper Tube: 14 PCS
    Heat Dissipation: 300-500 W
    High Light:

    copper heat sink

    ,

    extrusion heat sink

    Product Description

    300W - 500W Stamping Processing Copper Pipe Heat Sink For LED Stage Light

     

    OEM Fin Copper Heat Sink Customized Copper Pipe HeatSink For Passivite Surface Mount Device

     

    Type Copper pipe heatsink surface treatment Anodize warranty(year) 1       
    Process Stamping and CNC  Heat disspation 80-100W Cetification CS, ROHS
    Place of original Guangdong (China) Brand name LF Model Number LF-HS300-500CD
    Body Color Silver Shape Dimension 117*92*59.5 mm
    Body Material Aluminum  Application Computer Pipe Material Copper 

     

     

    Product Description
     

    3X Copper heat pipe ,The big power speed fan can automatically adjust the speed according to the heat change and effective energy conservation, reduce the inner temperature, to enhance the system reliability, The Fan speed runs up to about RPM 2500-3500

    Supports i3i5,i7 series, apply to Intel : LGA775/1150/1151/1155/1156,AMD/AM2/AM2+/AM3

     

    Application

     

    1. Led Fixtures

    2. Computers, server, video camera

    3. Other Surface Mount Device

     

     

     

     

    Packing and delivery

     

    Packaging Details

    We have the package advantage:
    1) The internal blister tray or pearl wool;
    2) external carton packaging.

     

    Delivery Time

    1) Sample in 3 workdays after payment. 

    2) Mass production after payment 20 days.

     

     

    Want to Know more details about this product
    I am interested in 300W - 500W Stamping Processing Copper Pipe Heat Sink For LED Stage Light could you send me more details such as type, size, quantity, material, etc.
    Thanks!
    Waiting for your reply.