-
GuillermoExcellent! Fast delivery! I like to work with you again!
-
Perus ColetteIt is my pleasure to do the business with LiFong,they always do the best for us.
-
Robin SeifertI like the products and service provided by LiFong. They really take our interest into consideration.
-
SjakThat's true we enjoy doing business with you.
-
Kelly MarshLiFong is one of our desired vendors in China
-
Raimund SchenkProduct Quality, Competitve Prices, always one of our key suppliers
Anodized Copper Aluminum Fin Copper Tubes Copper pipe Heat Sink 80W-200W

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xMaterial | Copper Pipe And Aluminum | Color | Anti - Anodized |
---|---|---|---|
Application | For Computer, Led Fixture, Other Device | Dimension | 150*190 Mm |
Weight | 500 G | Copper Tube | 14 PCS |
Heat Dissipation | 300-500 W | ||
Highlight | ROHS Anodized LED Heat Sink,GS LED Heat Sink,Extrusion Copper Pipe Heat Sink |
Anodized Copper Aluminum Fin Copper Tubes Copper pipe Heat Sink 80W-200W
Type | Copper pipe heatsink | surface treatment | Anodize | warranty(year) | 1 |
Process | Stamping and CNC | Heat disspation | 80-100W | Cetification | CS, ROHS |
Place of original | Guangdong (China) | Brand name | LF | Model Number | LF-HS300-500CD |
Body Color | Silver | Shape | U | Dimension | 117*92*59.5 mm |
Body Material | Aluminum | Application | Computer | Pipe Material | Copper |
3X Copper heat pipe ,The big power speed fan can automatically adjust the speed according to the heat change and effective energy conservation, reduce the inner temperature, to enhance the system reliability, The Fan speed runs up to about RPM 2500-3500
Supports i3i5,i7 series, apply to Intel : LGA775/1150/1151/1155/1156,AMD/AM2/AM2+/AM3
Application
1. Led Fixtures
2. Computers, server, video camera
3. Other Surface Mount Device
Packing and delivery
Packaging Details
We have the package advantage:
1) The internal blister tray or pearl wool;
2) external carton packaging.
Delivery Time
1) Sample in 3 workdays after payment.
2) Mass production after payment 20 days.