• LiFong(HK) Industrial Co.,Limited
    Guillermo
    Excellent! Fast delivery! I like to work with you again!
  • LiFong(HK) Industrial Co.,Limited
    Perus Colette
    It is my pleasure to do the business with LiFong,they always do the best for us.
  • LiFong(HK) Industrial Co.,Limited
    Robin Seifert
    I like the products and service provided by LiFong. They really take our interest into consideration.
Contact Person : Carl Peng
Phone Number : 86-13925550965
WhatsApp : +8613925550965

Chrome Plate ADC12 Aluminum Die Cast Products Automobile ABS Valve Housing

Place of Origin Guangdong, Mainland China
Brand Name LF
Certification ISO9001:2008, TS16949
Model Number LF-DJ1012
Minimum Order Quantity 1000 PCS
Price Negotiable
Packaging Details Part in Bubble Bag, then in Cartons, Wooden Pallet on Bottom, Film wrapped overall then Nylon belt fastened Or to be Customized Means of Packing.
Delivery Time MOQ 2 Weeks, 30,000pcs+ : 4 Weeks.
Payment Terms TT, L/C, Western Union
Supply Ability 100,000pcs Per Month
Product Details
High Light

die cast parts

,

high pressure die casting process

Leave a Message
Product Description

 

Application: 

 

ABS Valve Housing for Commercial Vehicle/ Multivan 

 

 

Specification:

 

Overall Dimension L180*W100*H100mm
Surface Treatment Chrome Plate
Part Weight 1200 Grams

 

 

Material: 

 

ADC12(Standard: JIS H 5302-2000)

 

 

Processing Technic:

  1. Die Casting Tooling Making--Prototype/T1--Dimension Check-- Sample Approval-- SOP
  2. Die Casting-- Remove Water Gap--Deburring-- Machining--Dilling Holes/ Threading--  Quality Check (dimension and STEAM TIGHT TEST) -- 
    Acid Washing -- Chrome Plate--QC (Surface Vision Checking)-- Packing

 

Facility:

 

Chrome Plate ADC12 Aluminum Die Cast Products Automobile ABS Valve Housing 0

Die Casting workshop

Chrome Plate ADC12 Aluminum Die Cast Products Automobile ABS Valve Housing 1

Machining Work Shop

Chrome Plate ADC12 Aluminum Die Cast Products Automobile ABS Valve Housing 2

 

CMM CHECKING ROOM

 

 

Advantages:

 

1. Professional Research and Design Team (20 Persons),  Possess All Necessary Equipments.

2. Strict Quality Control in Each Process and Finish Product Quality Control

3. Short Delivery Lead Time: 15-30 Days

4. Optional For OEM or ODM

5. Comprehensive After-Sale Service, Quick Responses For Daily Communication