OEM Curtain Bracket Aluminium Pressure Die Casting High Pressure Die Castings
Product Details:
Place of Origin: | Guangdong, Mainland China |
Brand Name: | LF |
Certification: | ISO9001:2008, TS16949 |
Model Number: | LF-DJ1110 |
Payment & Shipping Terms:
Minimum Order Quantity: | 1000 PCS |
---|---|
Price: | Negotiable |
Packaging Details: | Part in Bubble Bag, then in Cartons, Wooden Pallet on Bottom, Film wrapped overall then Nylon belt fastened Or to be Customized Means of Packing. |
Delivery Time: | MOQ 1 Week, 30,000pcs+ : 4 Weeks. |
Payment Terms: | TT, L/C |
Supply Ability: | 150,000 PCS Per Month |
Detail Information |
|||
High Light: | aluminium die casting components,high pressure die casting process |
---|
Product Description
OEM Curtain Bracket Aluminium Pressure Die Casting High Pressure Die Castings
Powder Coated Aluminum Pressure Die Casting Bracket of Curtain Rotation Shaft
Quick Details:
Precision Aluminum die casting & Aluminum casting
Large Image: Aluminum Bracket of Curtain Rotation Shaft, Spin Axis and Revolving Shaft.
Suface Treatment: Polish/Sanding Blasting/Brush Finish+ Powder Coating
Depend on customer's requirements
Description:
Large Image: Curtain Spiale Bracket
Bracket of Curtain Rotation Shaft
Bracket of Curtain Spin Axis
Bracket of Curtain Revolving Shaft
Application: Curtain Spiale
Specification:
Overall Dimension | L200*W150*H150mm |
Surface Treatment | Polish/Sanding Blasting/Brush Finish+ Powder Coating |
Part Weight | 400 Grams |
Material | ADC12 (Standard: JIS H 5302-2000) ; America : 383 (Standard: ASTM B 85-03 Standard ) |
Facility:
Die Casting Workshop
200 Ton Die Casting Machine
Machining Workshop
Processing Technic:
1. Die Casting Tooling Making--Prototype/T1--Dimension Check-- Sample Approval-- SOP
2. Die Casting-- Deburring-- Dilling Holes/ Threading-- Polishing-- Sand Blasting-- Quality
Check (dimension and surface) -- Oil Painting -- QC (Surface Vision Checking)-- Packing
Advantages:
1. Professional Research and Design Team (20 Persons), Possess All Necessary Equipments.
2. Strict Quality Control in Each Process and Finish Product Quality Control
3. Short Delivery Lead Time: 15-30 Days
4. Optional For OEM or ODM
5. Comprehensive After-Sale Service, Quick Responses For Daily Communication