-
GuillermoExcellent! Fast delivery! I like to work with you again!
-
Perus ColetteIt is my pleasure to do the business with LiFong,they always do the best for us.
-
Robin SeifertI like the products and service provided by LiFong. They really take our interest into consideration.
New Design Customized Led Heatsink CPU Cooler High Heat resistant Heatsink
Place of Origin | Guangdong, Mainland China |
---|---|
Brand Name | LF |
Certification | ISO9001:2008 |
Model Number | LF-ZHY0467 |
Minimum Order Quantity | 100 PCS |
Price | Negotiable |
Packaging Details | Plastic Tray Or Customized |
Delivery Time | MOQ 1 Week, 5,000pcs 4 Weeks. |
Payment Terms | TT, L/C, Western Union |
Supply Ability | 30,000pcs Per Month |
Material | Aluminum, Copper Pipe | Processing | Stamping, CNC Machining, Bending |
---|---|---|---|
Color | Silver | Weight | 250G |
High Light | copper heat sink,extrusion heat sink |
New Design Customized Led Heatsink CPU Cooler High Heat resistant Heatsink
Large Image: Aluminum Fin Heat Sink with Copper Pipe
100W Big Power Copper Pipe Heat Sink
Copper Pipe Heat Sink for Projector
Heat Sink With Copper Pipe For Projector
Description:
Application: Projector
Specification:
Overall Dimension: L100*W30*3.6MM
Copper Tube: 8mm in Dia.
Tube Quantity: 3 pcs
Part Weight: 250Gram
Material:
Pure Copper C1100 Strips, Purity over 99.5% (Standard: JIS H3250-2006); Pure Aluminum Board A1060 Purity Over 99.6% .(Standard: GB/T3880-2006).
Little Impurity brings very good Electrical and Heat Conduction; Excellent Performance In Corrosion Resistant as well.
Processing Technic:
1. Copper Fins: Progressive Die Stamping
2. Aluminum Enclosure: Extrusion+ Machining
3. Copper Tube Forming : Automatic Tube Bending+ Burn into Tip Ends.
4. Aluminum Board and Enclosure Nickle Plated, Copper Fin Passivate (Insulation,
Oxidation and Corrosion Resistance).
5. Assembly: Automatic Fin Wearing/Assembly, then Fixed by Overflow Soldering and
Screw/Rivet Combination.
6. Quality Check
7. Packing
Advantages:
1. Professional Research and Design Team, Strong & Automatic Equipments: Progressive
Stamping, Automatic Tube Bending Machine, Automatic Fin Wearing Machining
2. Strict Quality Control in Each Process and Finish Product Quality Control
3. Short Delivery Lead Time: 15-30 Days
4. Optional For OEM or ODM
5. Comprehensive After-Sale Service, Quick Responses For Daily Communication