• LiFong(HK) Industrial Co.,Limited
    Guillermo
    Excellent! Fast delivery! I like to work with you again!
  • LiFong(HK) Industrial Co.,Limited
    Perus Colette
    It is my pleasure to do the business with LiFong,they always do the best for us.
  • LiFong(HK) Industrial Co.,Limited
    Robin Seifert
    I like the products and service provided by LiFong. They really take our interest into consideration.
Contact Person : Carl Peng
Phone Number : 86-13925550965
WhatsApp : +8613925550965

Professional Aluminium Die Castings Zinc Die Casting Parts

Place of Origin Guangdong, Mainland China
Brand Name LF
Certification ISO9001:2008, TS16949
Model Number LF-DJ0187
Minimum Order Quantity 500 PCS
Price Negotiable
Packaging Details Part in Bubble Bag, then in Cartons, Wooden Pallet on Bottom, Film wrapped overall then Nylon belt fastened Or to be Customized Means of Packing.
Delivery Time MOQ 2 Weeks, 5,000pcs+ : 4 Weeks.
Payment Terms TT, L/C, D/P, Western Union
Supply Ability 10,000 PCS Per Month
Product Details
Materal A380.ADC12.A360 Or According To Customized OEM Yes
Surface Finish Painting Ot Powder Coating Shape According To Customized
Color Natural,Black Or According To Customzied
High Light

aluminium die casting components

,

led lighting housing

Leave a Message
Product Description

Professional Aluminium Die Castings Zinc Die Casting Parts​

 

 

Description:

 

Large Image:  Aluminum Cast Part

                     

           

 

 

Specification:

 

Overall Dimension

L15*W8*H2mm

Color

silver and balck

Surface Treatment

Electrostatic Spraying

Part Weight

 0.5kgs

Material

A380 ,zinc

 

 

 

 

Processing Technic:

 

1. Die Casting Tooling Making--Prototype/T1--Dimension Check-- Sample Approval-- SOP

2. Die Casting-- Remove Water Gap--Deburring-- Machining--Dilling Holes/ Threading-- Quality Check (dimension and surface) --Electrostatic Coating--QC (Surface Vision Checking)-- Packing

High Quality Outside Usage Powder Coating surface makes very good performance in Oxidation Resistance And Corrosion Resistance.

 

 

 

 

Advantages:

 

1. Professional Research and Design Team (20 Persons), Possess All Necessary Equipments.
2. Strict Quality Control in Each Process and Finish Product Quality Control
3. Short Delivery Lead Time: 15-30 Days
4. Optional For OEM or ODM
5. Comprehensive After-Sale Service, Quick Responses For Daily Communication