-
GuillermoExcellent! Fast delivery! I like to work with you again!
-
Perus ColetteIt is my pleasure to do the business with LiFong,they always do the best for us.
-
Robin SeifertI like the products and service provided by LiFong. They really take our interest into consideration.
Brass Four Copper Pipe Heat Sinks Metal Stamping Parts Copper Fin Heat Sinks
Place of Origin | Guangdong,China |
---|---|
Brand Name | LF |
Certification | ISO9001:2008 |
Model Number | LF-8032 |
Minimum Order Quantity | 1000pcs |
Price | Negotiable |
Packaging Details | Bubble Film, Cardboard Box, Wooden Frame or as your requirements |
Delivery Time | 15-30 workdays,according to the order quantity |
Supply Ability | 120000/year |

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xMaterial | Aluminum ,Copper | Craft | Stamping |
---|---|---|---|
Aplication | Copper Pipe Heatsinks | Surface Treatment | Nickel Plating,Oxidation |
Power | 120W | Size | 125*50*160(mm) |
High Light | precision metal stamping,custom made metal stamps |
Brass Four Copper Pipe Heat Sinks Metal Stamping Parts Copper Fin Heat Sinks
Specifications:
1. Main material: Aluminum ,Copper
2. Surface finish: Oxidation,Neckel Plating.
3. Overall demension: L125*W50*H160mm
4. Weight per meter: 443.4G
5. Bed demensions: 40mm*40
Processing technique:
1. Aluminum fins: progressive die stamping
2. Assembly: Automatic fin wearing/assembly then fixed by overflow soldering ang scrw/rivet combination
3. Quality check
4. Packing
Description:
Product name | Copper Pipe Heat Sinks |
Item No. | LF-8032 |
Material | Aluminum ,Copper |
Surface treatment | Oxidation,Nickel plating |
Warped piece quantity | 48pieces |
Packing | According to customer requiremens. |
Production time | 15-30days,it is up to the order. |
Copper quantity | 4pieces |
payment term | T/T,L/C |
Advantages:
1. Professional research and design team, strong & automatic equipment: progressive stamping, automatic tube bending machine, automatic fin wearing machining
2. Strict quality control in each process and finish product quality control
3. Short delivery lead time: 15-30 days
4. Optional for OEM or ODM
5. Comprehensive after-sale service, quick responses for daily communication