-
GuillermoExcellent! Fast delivery! I like to work with you again!
-
Perus ColetteIt is my pleasure to do the business with LiFong,they always do the best for us.
-
Robin SeifertI like the products and service provided by LiFong. They really take our interest into consideration.
-
SjakThat's true we enjoy doing business with you.
-
Kelly MarshLiFong is one of our desired vendors in China
-
Raimund SchenkProduct Quality, Competitve Prices, always one of our key suppliers
Outdoor LED Heat Sink Floodlight Metal Stamping Process ADC12 A380

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xMaterial | Aluminum Alloy ADC12 A380, Aluminium | Process | Die Casting |
---|---|---|---|
Aplication | LED Heatsink, LEd Housing. | Color | Design |
Shape | Square | ||
Highlight | precision metal stamping,custom made metal stamps |
Outdoor LED Heat Sink Design for Floodlight Metal Stamping Process ADC12 A380
Specifications:
1. Place of origin: Duangdong China (Mainland)
2. Brand name: LIFONG
3. Material: Aluminum, Aluminum Alloy ADC12 A380
4. Shape: Square
5. Application: LED heatsink .LEd housing.
6. Machine: 180 tons -1200 tons
Specifications
1. 150W outdoor led heat sink design for floodlight
2. RoHS
3. Die cast aluminum ADC12
4. Agent wanted
5. Good cooling
Description:
|
Metal Stamping Process | |
Item No. | LF-Y9210 | |
Service | Drawings or sample processing | |
Materials | Aluminium,Aluminum Alloy ADC12 A380 | |
Precision processing | Die Casting | |
QC (inspection everywhere ) | 15-30days,it is up to the order. | |
Package | PP bag/carton or according customers' requirement | |
payment term | T/T,L/C |
Advantages:
1. Professional research and design team, processes all necessary equipment: Extrusion machine: 2 sets, CNC machine: 20 sets (Maximum working platform: 1600*80), drill/threading machining: 25 Machines
2. Strict quality control in each process and finish product quality control
3. Short delivery lead time: 15-30 days
4. Optional for OEM or ODM
5. Comprehensive after-sale service, quick responses for daily communication