-
GuillermoExcellent! Fast delivery! I like to work with you again!
-
Perus ColetteIt is my pleasure to do the business with LiFong,they always do the best for us.
-
Robin SeifertI like the products and service provided by LiFong. They really take our interest into consideration.
Metal Stamping Assembly Aluminum Heat Sinks Reflow Soldering LED Heat Sink
Place of Origin | Guangdong,China |
---|---|
Brand Name | LF |
Certification | ISO9001:2008 |
Model Number | LF-8930 |
Minimum Order Quantity | 500pcs |
Price | Negotiable |
Packaging Details | Bubble Film, Cardboard Box, Wooden Frame or as your requirements |
Delivery Time | 15-30 workdays,according to the order quantity |
Supply Ability | 120000/year |

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xMaterial | Alu Fin Is 1000series,Base Is AL 6063 | Craft | Stamping |
---|---|---|---|
Aplication | LED Aluminum Heat Sink | Surface Treatment | Painting, Plating Or Customized |
Power | Customized | Size | As Your Requirment |
High Light | electronic heat sink,aluminum heat sink extrusions |
Metal Stamping Assembly Aluminum Heat Sinks Reflow Soldering LED Heat Sink
Specifications:
1. Main material: Aluminum
2. Surface finish: Painting, Plating or customized
3. Application: LED aluminum heat sink
4. Weight per meter: 443.4G
5. Bed demensions: 40mm*40
Processing procedure:
Pressing fin/riveting fin/Ni plating/surface inspection/packing
Description:
Product name | Reflow Soldering LED Heat Sink |
Item No. | LF-8930 |
Material | Aluminum |
Surface treatment | Painting&Plating |
Packing | standard export package, we can also follow the packing requirement from customer |
Production time | 15-30days,it is up to the order. |
Product type | Extrusion heat sink, heat pipe heat sink, skiving fin heat sink, stamping heat sink, die casting heat sink, precision CNC machining parts. |
payment term | T/T,L/C |
Advantages:
1. Professional research and design team, strong & automatic equipment: progressive stamping, automatic tube bending machine, automatic fin wearing machining
2. Strict quality control in each process and finish product quality control
3. Short delivery lead time: 15-30 days
4. Optional for OEM or ODM
5. Comprehensive after-sale service, quick responses for daily communication
Sample Room